• Rona-2025.jpg
  • whistleradaptive.jpg
  • Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
  • About Us
  • Send News & Press Releases
  • Contact
  • Advertise
  • News Alerts
The Whistler Daily Post

The Whistler Daily Post

Thursday May 22, 2025
  • Home
  • Whistler
  • Pemberton/Region
  • BC
  • Life
  • Lux-Mountain-Homes.jpg
  • SD48-revosed.jpg

Whistler moves forward with higher-density housing in Cheakamus Crossing

https://www.whistlerdailypost.com/wp-content/uploads/2025/04/Cheakamus-crossing.png
staff report
April 25, 2025 11:24am

Whistler’s mayor and council have given the first three readings to a zoning amendment bylaw that would allow for higher-density development on a new employee-restricted housing project in Cheakamus.

The proposed changes would enable the construction of a five-storey apartment building and a set of townhouses on a 0.85-hectare site known as Lot 3, located between the Cheakamus River, Mount Fee Road, and an existing single-family and duplex development.

The land is zoned for employee townhouse housing and sits next to a future park area.

Planner Louis-Felix Renaud told the council that increasing the number of units on Lot 3 would lower the per-square-foot construction cost, making the project more financially viable and supporting the affordability of the employee housing.

The development proposes 105 apartment units, including 14 studios averaging 37.87 square metres, 75 one-bedroom units averaging 49.1 square metres, and 16 two-bedroom units averaging 72.47 square metres. Additionally, 20 three-bedroom townhouses, each approximately 113 square metres, would be built in four two-storey blocks. Municipal staff said the design would be similar in style and scale to the existing Phase 2 neighbourhood of Cheakamus Crossing.

The apartments and townhouses would be built over a shared underground parkade offering 145 resident parking stalls, with 15 visitor parking spots at ground level. According to the municipal report, parking will be limited to one stall per apartment and two stalls per townhouse to reduce construction costs.

To maintain the overall density limits for Phase 2, the bylaw also proposes reducing the permitted ground-floor area near 1825 Mount Fee Road (Lot 6). Staff have recommended several conditions before final adoption, including placing a covenant on Lot 3 to secure the building plans, establishing a parking management plan, setting occupancy requirements and rental rates, and completing the neighbourhood park before occupancy.

Share

Water meters coming to Pemberton homes and businesses

Woman dies in slackline accident near Squamish

Speeders, impaired drivers to be targeted on Sea to Sky Highway this long weekend

Reader Interactions

Comments

No Comments

Leave a comment

NOTE: Whistler Daily Post welcomes your opinions and comments. We do not allow personal attacks, offensive language or unsubstantiated allegations. We reserve the right to edit comments for length, style, legality and taste and reproduce them in print, electronic or otherwise. For further information, please contact the editor or publisher, or see our Terms and Conditions.

Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

  • Nancy-WHISTLER.png
  • vertical-ad-firetail-scaled.jpg

Footer

  • About Us
  • Advertise
  • Privacy
  • Terms & Conditions
Top Copyright ©2022 Whistler Daily Post. All Rights Reserved Whistler Daily Post